Geodetic Services for the Bjelovar Wastewater Treatment Plant

Comprehensive geodetic services throughout the construction of the Bjelovar Wastewater Treatment Plant (WWTP) – from staking out to as-built documentation.

ClientUPOV Bjelovar / Izvođač radova
LocationBjelovar

Full-scope geodetic services were delivered throughout every phase of the Bjelovar Wastewater Treatment Plant construction. The scope included staking out the structure, control measurements during construction, deformation monitoring, and preparation of as-built survey documentation.

Special attention was given to height control and structural geometry verification to ensure compliance with the design documentation. A combination of GNSS receivers and total stations was used to achieve the required accuracy on this demanding construction site.

Final deliverables included the as-built geodetic survey report and a utility infrastructure survey, both serving as the basis for the occupancy permit and cadastral registration.